Environment and Infrastructure

  • Developing capabilities, tools and means to mitigate the effects of floods and wastewater
    • Preparing a sewage study with the necessary design and promoting it
    • Establishing a rainwater drainage network in areas prone to flooding
  • Developing the infrastructure of the internal road network in the town
    • Construction, rehabilitating and paving roads
    • Road maintenance and rehabilitation
    • Create sidewalks, medians and plant trees
  • Electricity grid development and management
    • Power factor improvement panels installation
    • Establishment of new electrical power conversion stations
    • Complete the conversion of street lighting to LED
    • Completion of replacing old low-voltage networks with ABC cables
    • Supply and installation of new low-voltage networks (ABC cables) + electricity poles
    • Supply and installation of medium pressure networks (ground)
    • Supply and installation of street lighting in the industrial area (lighting poles and units).
    • Establishing solar power stations for the municipality, especially for water pumps and landfill
    • Supply of smart prepaid meters (STS)
    • Supply and installation of meters on transformers and remote monitoring system
    • Installation of SCADA system with transformers
    • Implementation of training programs to raise the capabilities of the Electricity Department
  • Water network development and management
    • Establishment of a water transmission line and a feeder line
    • Construction of water tank and transmission line
    • Create new water lines
    • Replacing old water lines
    • Construction of a public building in the Beer area
    • Water well development including a generator, solar tank and chlorine room
    • Supply and installation of booster pumps
    • Updating and developing the town’s water system modeling study, and training specialists in the water department on the WATERCAD program.
    • Conduct a specialized scientific study to clarify the causes of loss, its distribution and types.
Developing capabilities, tools and means to mitigate the effects of floods and wastewater
Fully completed (1/2 )
In progress (0/2 )
Not started yet (0/2 )
Preparing a sewage study with the necessary design and promoting it
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Developing capabilities, tools and means to mitigate the effects of floods and wastewater
Fully completed (1/2 )
In progress (0/2 )
Not started yet (0/2 )
Establishing a rainwater drainage network in areas prone to flooding
Fully completed (1/1 )
In progress (0/1 )
Not started yet (0/1 )
Developing the infrastructure of the internal road network in the town
Fully completed (0/3 )
In progress (3/3 )
Not started yet (0/3 )
Construction, rehabilitating and paving roads
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Developing the infrastructure of the internal road network in the town
Fully completed (0/3 )
In progress (3/3 )
Not started yet (0/3 )
Road maintenance and rehabilitation
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Developing the infrastructure of the internal road network in the town
Fully completed (0/3 )
In progress (3/3 )
Not started yet (0/3 )
Create sidewalks, medians and plant trees
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Power factor improvement panels installation
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Establishment of new electrical power conversion stations
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Complete the conversion of street lighting to LED
Fully completed (1/1 )
In progress (0/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Completion of replacing old low-voltage networks with ABC cables
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Supply and installation of new low-voltage networks (ABC cables) + electricity poles
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Supply and installation of medium pressure networks (ground)
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Supply and installation of street lighting in the industrial area (lighting poles and units).
Fully completed (1/1 )
In progress (0/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Establishing solar power stations for the municipality, especially for water pumps and landfill
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Supply of smart prepaid meters (STS)
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Supply and installation of meters on transformers and remote monitoring system
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Installation of SCADA system with transformers
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Electricity grid development and management
Fully completed (2/12 )
In progress (5/12 )
Not started yet (0/12 )
Implementation of training programs to raise the capabilities of the Electricity Department
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Establishment of a water transmission line and a feeder line
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Construction of water tank and transmission line
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Create new water lines
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Replacing old water lines
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Construction of a public building in the Beer area
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Water well development including a generator, solar tank and chlorine room
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Supply and installation of booster pumps
Fully completed (0/1 )
In progress (1/1 )
Not started yet (0/1 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Updating and developing the town’s water system modeling study, and training specialists in the water department on the WATERCAD program.
Fully completed (0/0 )
In progress (0/0 )
Not started yet (0/0 )
Water network development and management
Fully completed (0/8 )
In progress (4/8 )
Not started yet (0/8 )
Conduct a specialized scientific study to clarify the causes of loss, its distribution and types.
Fully completed (0/1 )
In progress (0/1 )
Not started yet (0/1 )